by Gary Marsh.
I am the administer of our Moodle 1.9.5 Build 20090515 production site that I will upgrade to Moodle 2.??.??, eventually.
Meanwhile, I have installed the Moodle 2.2.2, Build 20120312, Windows Version onto my Windows 7 Professional operating system laptop where I want to re-develop our site offline with a fresh start and eventually migrate it to a newly installed server based Moodle 2.??.??.
Will this process be troublesome and do I need to manually re-create the existing server production site courses onto the Windows version or can I backup the existing courses and cleanly restore them onto the Windows version?